The road in the middle of the screen will be the new fire access road along the west side of the new school and between the new track/football field. The others are temporary hauling roads.

Mora High School new construction photo

The stock pile of agricultural lime (the lighter material) is from the existing baseball fields, and will be repurposed on the base layer for the new fields.

Mora High School new construction photo

The berm system along Grove Street is a temporary holding place for the removed topsoil from the site. This will be distributed once needed. The system also serves as a temporary storm water holding area.

Mora High School new construction photo

This photo is showing what used to be the Welia entryway. This was demolished and removed to incorporate the new high school game gym, which will tie into the Welia Center at this area.


Mora High School new construction photo

Here the ground/building elevation jumps 8' . This occurs at the upper to lower commons break, outside the auditorium.

Mora High School new construction photo

Sanitary sewer tie in to existing Manhole.